Lagos Announces Marine Bridge Closure For 5 Months

Marine bridge, Lagos state
The Lagos state government has announced the closure of Marine bridge for repairs from March 28 to Aug. 15.

Lagos State To Close Constain Bridge For 3 Months
This was contained in a statement issued by The Public Affairs Unit of the state Ministry of Transportation.
The statement said that the repair would last for a period of 20 weeks and advised motorists to adhere to the regulations issued by the Lagos traffic team during the period.
“The repair works, which will take duration of 20 weeks, would be done in two phases to ease traffic movements.

Lagos State
“The first half of the construction works will last for the first 10 weeks; thereafter, the second half would commence equally and last for 10 weeks.
Read more: Lagos State Begins Fumigating Markets In The State {Pictures}
“The closure has been slated for between 8.00p.m and 8.00a.m daily to ensure there is smooth and uninterrupted flow of the repair works.
“Therefore, road users are advised to comply with the traffic diversions to minimise inconveniences in movements, as they will be allowed to ply only the available sides of the roads while the construction works lasts.”

Leave a Reply